The following progress was made this week on the facilities update project:
• Auxiliary gym bleacher was installed
• Finished auxiliary gym flooring
• Tech Ed garage doors were installed
• CJSHS entrance to the auxiliary gym is complete minus logos that will adorn the area and transition thresholds which are on backorder
• 4K-6 cafeteria steel was erected
• 4K-6 interior firewall installed
• 4K-6 interior new addition steel erected
• 4K-6 locker area demo, including 5th & 6th grade hallway
#BeCougarProud